The Ringaskiddy site includes wet and dry production areas, classified cleanrooms, warehousing, laboratories, solvent tank farms and extensive infrastructure, waste treatment facilities, environmental protection installations, technical services, support facilities and administration.
Extensions were carried out adjacent to live process buildings and existing pipe racks which remained fully operational during the project, requiring the implementation of a stringent permit system and strict safety protocols. The scope of our work included construction of a four-storey reinforced concrete extension on the east side of the existing annex building, and a manifold beam on the building’s west side. The build used structural steel frames encased with concrete, trocal roofing, and architectural profile cladding. We carried out an extensive fit-out of services and equipment, including laboratory equipment, patent and stud partitions, block work, acid tiling and finishes, plus advanced mechanical and electrical work.