The ground floor contains double-height entry and reception space on the eastern side, with meeting rooms, canteen and ancillary staff functions located behind, a research and development laboratory. The façade was constructed using an integrated glass and aluminium panel curtain wall system, high performance glazing utilising Low-E coatings will be used to combat solar gains.
The roof level contains three plant rooms and a screened plant area that services the entire building.
Extensive landscaping, paving and planting is done around the site with over 150 car parking spaces. The landscaping was designed to shield the buildings discreetly from neighbours and traffic but also ensure the campus remains open and light.